

Later that day, the picker-driver returns to the car park, job done - and frozen solid by the stiff winds at the top of the tower, right up above the Clyde. Some photos of the tower top should follow, once the contractor e-mails them.
Now to wait for the next rain to test the repairs. Shouldn't have long to wait in Argyll!
No comments:
Post a Comment